Customization: | Available |
---|---|
After-sales Service: | Long Time |
Warranty: | One Year |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Constructed with a full stainless steel evaporator adhering to stringent food sanitation standards, our system boasts a modular design that enhances stainless steel heat transfer efficiency. Utilizing advanced manufacturing techniques, the evaporator guarantees long-term performance without deformation or leakage.
FF0.3E/FF0.5E/FF1E/FF1.5E/FF2E/FF2.5E/FF3E
Model | Dimensions of Ice Making Systems | Connecting Refrigeration Systems Pipes Size | |||
L | W | H | Intemal Dia Intet Liquid pipe | Intemal Dia of Air Rejection Pipe | |
FF0.3E | 800mm | 750mm | 754mm | ф12.7mm | ф16mm |
FF0.5E | 800mm | 750mm | 840mm | ф12.7mm | ф16mm |
FF1E | 1050mm | 850mm | 890mm | ф12.7mm | ф22mm |
FF1.5E | 1050mm | 850mm | 965mm | ф12.7mm | ф22mm |
FF2E | 1050mm | 850mm | 1130mm | ф12.7mm | ф22mm |
FF2.5E | 1050mm | 850mm | 1210mm | ф12.7mm | ф22mm |
FF3E | 1050mm | 850mm | 1290mm | ф12.7mm | ф22mm |
Model | Ice Capacity/24hours | Demanding Refrigerating Capacity | Gear Motor Power | Water Pump Power | Water Consumption | Water Pipe Ext Threads | Drainpipe External Dia. | Net Weight |
FF0.3E | 0.3T | 1.65KW | 120W | 10W | 21L/H | 3/4"GAS | φ21mm | 85kg |
FF0.5E | 0.5T | 2.75KW | 120W | 10W | 34L/H | 3/4"GAS | φ21mm | 117kg |
FF1E | 1T | 5.5KW | 180W | 10W | 42L/H | 3/4"GAS | φ21mm | 130kg |
FF1.5E | 1.5T | 8.5KW | 180W | 10W | 63L/H | 3/4"GAS | φ21mm | 138kg |
FF2E | 2T | 11KW | 180W | 10W | 85L/H | 3/4"GAS | φ21mm | 146kg |
FF2.5E | 2.5T | 13.5KW | 180W | 10W | 105L/H | 3/4"GAS | φ21mm | 155kg |
FF3E | 3T | 16.5KW | 180W | 20W | 125L/H | 3/4"GAS | φ21mm | 165kg |
2. Alternatively, Grant engineers can handle the installation. For purchases over 5 tons, we will dispatch 1~2 engineers (depending on the project size) to oversee and finalize the installation and commissioning.
a. Clients are responsible for covering all expenses related to the engineer's travel and accommodation during the installation period.