Customization: | Available |
---|---|
After-sales Service: | Long Time |
Warranty: | One Year |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Introducing the Flake Ice Machine air-cooled complete unit by Ningbo Grant Refrigeration Equipment Manufacturing Co., Ltd. This unit features a full stainless steel evaporator, meeting strict food sanitation requirements. Its modular design enhances stainless steel heat transfer efficiency. The advanced manufacturing process ensures the evaporator's durability with no deformation or leakage.
Model | Dimension of Ice Machine | Dimension of Condenser | ||||
L | W | H | L1 | W1 | H1 | |
FF5AS | 2100mm | 1800mm | 1300mm | 1920mm | 1000mm | 1185mm |
FF7.5AS | 2100mm | 1800mm | 1600mm | 2450mm | 1175mm | 1265mm |
FF10AS | 2350mm | 1950mm | 1900mm | 3100mm | 1150mm | 1250mm |
FF15AS | 4100mm | 2200mm | 1650mm | 4100mm | 1250mm | 1350mm |
FF20AS | 4100mm | 2200mm | 1950mm | 3100mm | 1150mm | 1250mm(two) |
Model | Ice Storage Capacity/24hours | Condenser | Gear Motor Power | Water Pump Power | Rated Power | Water Demand | Water Pipe Ext Threads | Drainpipe External Dia. | Net Weight | Condenser Weight |
FF5AS | 5T | Air-Cooled | 180W | 65W | 28KW | 208L/H | 3/4"GAS | φ21mm | 900kg | 238kg |
FF7.5AS | 7.5T | Air-Cooled | 370W | 65W | 20KW | 313L/H | 3/4"GAS | φ21mm | 1150kg | 275kg |
FF10AS | 10T | Air-Cooled | 370W | 65W | 37KW | 417L/H | 3/4"GAS | φ21mm | 1350kg | 420kg |
FF15AS | 15T | Air-Cooled | 2X370W | 2X65W | 54KW | 625L/H | 3/4"GAS | φ21mm | 2000kg | 680kg |
FF20AS | 20T | Air-Cooled | 2X370W | 2X65W | 79KW | 834L/H | 3/4"GAS | φ21mm | 2500kg | 2X420kg |
2. Installation by Grant engineers is available. When purchasing machine over 5tons, Grant will arrange 1~2engineers, depending on the project size, to visit installation sites for final supervision and commissioning.
a. Customers are responsible for providing all expenses of the engineer during installation include transportation.
b. Power, water, installation tools, and spare parts must be prepared before Grant engineers arrive.