Customization: | Available |
---|---|
After-sales Service: | Long Time |
Warranty: | One Year |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Model List:
G70SC/G100SC/G130SC/G350M/G550M
Remarks:Ice storage bin is optional.Model | Ice Storage Bin | Ice Storage Capacity | Dimension of Ice Machine | Dimensions of Ice Storage | ||||
D1 | W1 | H1 | D | W | H | |||
G70SC | Self Contained | 30kg | 615mm | 585mm | 1135mm | - | - | - |
G100SC | Self Contained | 35kg | 615mm | 585mm | 1135mm | - | - | - |
G130SC | Self Contained | 40kg | 615mm | 585mm | 1135mm | - | - | - |
G350M | CX400 | 400kg | 660mm | 600mm | 745mm | 1258mm | 1096mm | 1160mm |
G550M | CX400 | 400kg | 660mm | 600mm | 885mm | 1258mm | 1096mm | 1160mm |
Model | Refrigerating Capacity/24hours | Condenser | Power | Current Draw | Wiring | Water Consumption | Water Pipe Ext Threads | Drainpipe External Dia. | Net Weight |
G70SC | 70kg | Air-Cooled | 430W | 2.6A | 3X1mm2 | 2.9L/H | 3/4"GAS | φ21mm | 66kg |
G100SC | 100kg | Air-Cooled | 500W | 3.3A | 3X1mm2 | 4.2L/H | 3/4"GAS | φ21mm | 68kg |
G130SC | 130kg | Air-Cooled | 570W | 3.5A | 3X1mm2 | 5.4L/H | 3/4"GAS | φ21mm | 70kg |
G350M | 350kg | Air-Cooled | 1160W | 5.6A | 3X1.5mm2 | 14.5L/H | 3/4"GAS | φ21mm | 88kg |
G550M | 550kg | Air-Cooled | 1710W | 8A | 3X1.5mm2 | 23L/H | 3/4"GAS | φ21mm | 110kg |
Q1.What is the delivery time?
A: 2 weeks for 0.3-3ton,5-6 weeks for above 5ton ice machine.
Q2. Is customization available?
A:Yes.We can provide customization serices according to customer requirement.
Q3:What payment methods are supported?
A:The most common is a 30% in advance, with the remaining 70% due before shipment.
Q4:Installation &commissioning:
1. Customers can install the equipment themselves following the manuals, online instructions, and live video conferences provided by GRANT.
2. Installation by Grant engineers is available. When purchasing machine over 5tons, Grant will arrange 1~2engineers, depending on the project size, to visit installation sites for final supervision and commissioning.
a. Customers are responsible for providing all expenses of the engineer during installation include transportation.
b. Power, water, installation tools, and spare parts must be prepared before Grant engineers arrive.