Customization: | Available |
---|---|
After-sales Service: | Long Time |
Warranty: | One Year |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Full stainless steel evaporator which meet the strict food sanitation requirements. Modular design to effectively improve stainless steel treat transfer.Advanced manufacturing process, the evaporator can guarantee long time no deformation and no leakage.
CF0.3E / CF0.5E / CF1E / CF1.5E / CF2E / CF2.5E / CF3E
Model | Dimension of Ice Machine | Connecting Refrigeration Systems Pipes Size | |||
L | W | H | Intemal Dia Intet Liquid pipe | Intemal Dia of Air Rejection Pipe | |
CF0.3E | 800mm | 750mm | 745mm | ф12.7mm | ф16mm |
CF0.5E | 800mm | 750mm | 840mm | ф12.7mm | ф16mm |
CF1E | 1050mm | 850mm | 890mm | ф12.7mm | ф16mm |
CF1.5E | 1050mm | 850mm | 965mm | ф12.7mm | ф16mm |
CF2E | 1050mm | 850mm | 1130mm | ф12.7mm | ф16mm |
CF2.5E | 1050mm | 850mm | 1210mm | ф12.7mm | ф16mm |
CF3E | 1050mm | 850mm | 1290mm | ф12.7mm | ф16mm |
Model | Ice Capacity/24hours | Demanding Refrigerating Capacity | Gear Motor Power | Water Pump Power | Water Consumption | Water Pipe Ext Threads | Drainpipe External Dia. | Net Weight |
CF0.3E | 0.3T | 1.65KW | 120W | 10W | 13L/H | 3/4"GAS | φ21mm | 85kg |
CF0.5E | 0.5T | 2.75KW | 120W | 10W | 21L/H | 3/4"GAS | φ21mm | 117kg |
CF1E | 1T | 5.5KW | 180W | 10W | 42L/H | 3/4"GAS | φ21mm | 130kg |
CF1.5E | 1.5T | 8.5KW | 180W | 10W | 63L/H | 3/4"GAS | φ21mm | 138kg |
CF2E | 2T | 11KW | 180W | 10W | 85L/H | 3/4"GAS | φ21mm | 146kg |
CF2.5E | 2.5T | 13.5KW | 180W | 10W | 105L/H | 3/4"GAS | φ21mm | 155kg |
CF3E | 3T | 16.5KW | 180W | 20W | 125L/H | 3/4"GAS | φ21mm | 165kg |
2. Installation by Grant engineers is available. When purchasing machine over 5tons, Grant will arrange 1~2engineers, depending on the project size, to visit installation sites for final supervision and commissioning.
a. Customers are responsible for providing all expenses of the engineer during installation include transportation.
b. Power, water, installation tools, and spare parts must be prepared before Grant engineers arrive.