Customization: | Available |
---|---|
After-sales Service: | Long Time |
Warranty: | One Year |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Crafted with precision, our Freon Flake Ice Making Systems boast a full stainless steel evaporator that adheres to the highest food sanitation standards. The modular design enhances stainless steel's heat transfer capabilities, ensuring efficiency. Our advanced manufacturing processes guarantee the evaporator remains deformation-free and leak-proof over long periods.
FF0.3E / FF0.5E / FF1E / FF1.5E / FF2E / FF2.5E / FF3E
Model | Dimensions of Ice Making Systems | Connecting Refrigeration Systems Pipes Size | |||
L | W | H | Intemal Dia Intet Liquid pipe | Intemal Dia of Air Rejection Pipe | |
FF0.3E | 800mm | 750mm | 754mm | ф12.7mm | ф16mm |
FF0.5E | 800mm | 750mm | 840mm | ф12.7mm | ф16mm |
FF1E | 1050mm | 850mm | 890mm | ф12.7mm | ф22mm |
FF1.5E | 1050mm | 850mm | 965mm | ф12.7mm | ф22mm |
FF2E | 1050mm | 850mm | 1130mm | ф12.7mm | ф22mm |
FF2.5E | 1050mm | 850mm | 1210mm | ф12.7mm | ф22mm |
FF3E | 1050mm | 850mm | 1290mm | ф12.7mm | ф22mm |
Model | Ice Capacity/24hours | Demanding Refrigerating Capacity | Gear Motor Power | Water Pump Power | Water Consumption | Water Pipe Ext Threads | Drainpipe External Dia. | Net Weight |
FF0.3E | 0.3T | 1.65KW | 120W | 10W | 21L/H | 3/4"GAS | φ21mm | 85kg |
FF0.5E | 0.5T | 2.75KW | 120W | 10W | 34L/H | 3/4"GAS | φ21mm | 117kg |
FF1E | 1T | 5.5KW | 180W | 10W | 42L/H | 3/4"GAS | φ21mm | 130kg |
FF1.5E | 1.5T | 8.5KW | 180W | 10W | 63L/H | 3/4"GAS | φ21mm | 138kg |
FF2E | 2T | 11KW | 180W | 10W | 85L/H | 3/4"GAS | φ21mm | 146kg |
FF2.5E | 2.5T | 13.5KW | 180W | 10W | 105L/H | 3/4"GAS | φ21mm | 155kg |
FF3E | 3T | 16.5KW | 180W | 20W | 125L/H | 3/4"GAS | φ21mm | 165kg |
2. Installation by Grant Engineers: For machines over 5 tons, Grant will dispatch 1-2 engineers (depending on project size) to oversee final installation and commissioning.
a. Customers are responsible for covering all expenses for the engineers during installation, including transportation.